
This loading machine is operated by PLC with the feature of high flexibility. Users are allowed to modify the control program with the software available by downloading from our website. The machine has been programmed before delivery and we do not suggest users modify the control program, otherwise, this company shall assume no responsibilities for the failure caused by modification of the users.
1. Configuration
This machine has 4 switching buttons, including top button, lower button, feeding button and automatic/manual operation mode button.
2. Operation
After loading machine is connected with power supply and a workpiece is loaded on the platform, the machine shall operate automatically. In operating process, operating mode can be switched into manual mode if some problem occurs. Afterwards, the automatic mode can be resumed. As long as the machine is connected with power supply, the machine shall operate in preset mode stored in memory.
Length and travel of workpiece can be manually adjusted. The machine has two potentiometers, #0 and #1, for simulation time adjustment. Operation instructions of Siemens, the original producer, can be taken as reference. #0 potentiometer is used for adjusting the time of loading based upon the time from previous workpiece is removed and a new workpiece is loaded onto thread rolling die.
Slight adjustment is needed for different workpieces. #1 potentiometer makes adjustment based upon the time from one workpiece is removed from thread rolling die and next workpiece is pulled and turned on the position by the air cylinder . A micro-sized screwdriver or, if possible, computer can be used for adjustment. Location of the potentiometer is as per the circuit diagram.
When the machine is initiated, it will enter into automatic mode around 10 seconds from original operating mode.