1. Humidity requirements are 40%-80%, no condensation.
2. Power grid requirements: 380V; 50Hz/60A.
3. Power supply grid fluctuations: 5%, the grid ground wire meets international requirements.
4. Cutting with auxiliary gas: Clean, dry compressed air and high purity oxygen (O2)and nitrogen(N2), purity no less than 99.9% purity.
5. There should be no strong electromagnetic interference near the installation equipment.
6. Avoid radio transmitters or relay stations around the installation site.
7. Power grounding resistance: ≤ 4 ohms. Ground amplitude: less than 50um; vibration acceleration: less than 0.05g.
8. Avoid a large number of machine tools such as stamping in the vicinity.
9. Air pressure: 86-106kpa.
10. Equipment space requirements are guaranteed to be smoke-free and dust-free, avoiding dusty working environments such as metal polishing and grinding.
11. An anti-static floor must be installed and the shielded cable connected.
12. The water quality of the working cooling circulating water is strictly required, and pure water, deionized water or distilled water must be used.