Welcome Customer !

Membership

Kingstone Shoe-making Machinery Co. Ltd.
Free Member ·1YRS
DongGuan,GuangDong
Manufacturer

Main Products: Shoe making machine

Xwboo>Products
Product Categories

Kingstone Shoe-making Machinery Co. Ltd.Free·1YRS

  • E-mail

  • Phone

    86-769-86861088

  • Address

    Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong Province

Contact Now

China Three Color TPR Plastic Shoes Making Machine With Double Proportional Pressure Control factory

Model
Nature of the Manufacturer
Manufacturer
Product Category
Place of Origin
City, Province
Overview
China Three Color TPR Plastic Shoes Making Machine With Double Proportional Pressure Control factory
Product Details

Automatic Three Color Plastic Shoes Direct Injection Molding Machine for Sandals Slippers
JL-308-3C

 

 

Our machine is able to produce all kinds of one color,two color and three color shoes,sandals and slippers

Normally it is special for fashion and colorful shoes for woman and kids.

 

Three Color TPR Plastic Shoes Making Machine With Double Proportional Pressure Control 0

 

 

Features:

1. This machine is specially used for producing three colors plastic shoes,sandals and slippers. 
​     it also can produce one color and two color plastic shoes.
2. Raw materials for the production of a variety of thermoplastic raw materials, such as: TPR, PVC, etc..
3. Double proportional pressure control, independent injection pressure and speed control of each mold.
4. Our machine is controlled by touch screen system,it has English,Spanish,French,Vietnam language.

 

 

MODELUNITJL-308
Number of work stationStations20/24/30
Productivity per hourPairs100-120
Screw Diametermm70/65/60
Screw Length diameter ratioL/D21:1
Max. injection volumeCm3700/600/600
Max. injection pressureKgf/cm2650
Mould clamping forcetons120
Mould space(L*W)mm550*400
MotorKw/hp18.5*3
Auto thermo controllersets8
Heating bands powerkw5*3
Total electric consumptionkw78.5
Machine dimension(L*W*H)m7.5*6*3.5
Weight(Approximate)tons15.5

 

 

After-sales Service
 

1. We will send technicians to buyer's factory for installation and training for 5-10days;

2. Our technicians will help you to install machine and works machine;

3. After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.

4. After your workers can produce shoes very skilled, then our technicians back.

5. Also you can send your technicians to our factory for training.

6. Any questions can contact us, we will reply you within 24 hours.

 

 

FAQ

1. Are you manufacturer?

Yes, we are manufacturer for shoe making machine and shoe mold. Welcome to visit our factory!

Address: Huarui Industrial Park, Hengjiang Village, Chashan Town, Dongguan City, Guangdong P.R.C

2. What do you think of the quality of your machine?

The boss start machine business many years, so he know the quality for machine is very important. From Kingstone Machinery Beginning, we stressed the high quality of machine to win a good reputation.

We are confident with our machine.

3. What's the price of your machine?

The price of our machine is not lowest, but competitive. We stress the machine quality, so the spare parts of our machine is made from international brand. With it, we keep high quality and competitive price.

4. Can you provide the machine detailed information and video?

Yes, we can provide the detailed information of machine and video to you if you want it.

5. Can we see the machine working while I come your factory?

Yes.

6. What do you think the different between your machine with other machines?

That's a good question.

First, the spare parts is different. Ours is made from international brand, others is made from domestic factory. The function has a big different. That is why other machines can provide lower price.

Second, the conformation of the machine. According to the height of people, we adjust the height of the machine, now it's convenient to put the mold and take the shoes from the mold for everyone.

Third, the performance of the machine. Previous machine will waste some materials in the working process. Now we make changes and reduce this kind of waste. It will help our customers to reduce the cost.

.....

7. How about the delivery time?

The delivery time is about 30-45 days. Because we need arrange production line, and after finished, we need test the machine some days. If you are urgently, we can try our best to arrange the production.

8. Will your company will send the technical workers to my factory?

Yes, we will send our technical workers to your factory and install the machine and teach your workers how to operate the machine. But your factory need arrange the living and food.