Some precautions for the operation of IUH oil seal are as follows:
1.If there is slight leakage after the pump is started, it should be observed for a period of time. If the leakage does not decrease after continuous operation for 4 hours, the pump shall be stopped for inspection.
2. The operating pressure of the pump shall be stable, and the pressure fluctuation shall not be greater than 1kg / cm2.
3. Pump in operation, should avoid pumping phenomenon, so as to avoid causing dry friction and seal sealing surface damage.
4. The sealing condition should be checked frequently. During operation, when the leakage exceeds the standard, the heavy oil shall not be more than 5 drops / min and the light oil shall not be more than 10 drops / min. if there is no improvement trend within 2-3 days, the pump shall be stopped to check the sealing device.