Welcome Customer !

Membership

JIANGSU TUOCHUANG SCIENTIFIC RESEARCH INSTRUMENTS CO., LTD.
Free Member ·1YRS
,
Other

Main Products: 科研仪器设备

Xwboo>Products
Product Categories

JIANGSU TUOCHUANG SCIENTIFIC RESEARCH INSTRUMENTS CO., LTD.Free·1YRS

  • E-mail

    jstc08@126.com

  • Phone

    0513-81855588

  • Address

    No. 8, hengkun road, high-tech zone, hai'an county, jiangsu province

Contact Now

Gas Charging Device

Model
Nature of the Manufacturer
Other
Product Category
Place of Origin
City, Province
Overview
Gas Charging Device
Product Details

In a large number of industrial and test equipment applications, high pressure gas is an important part of the test process. The gas pressurization station produced by our company mainly pressurizes the gas in the cylinder less than or equal to 15MPa into the pressure container of 70Mpa to meet the high pressure demand of instruments and equipment. And referred to the domestic and foreign standards, comprehensive domestic and foreign advanced technology, process improvement, excellent manufacturing quality, fully save energy.

I. Main technical indicators:

1. Maximum pressurization pressure: 70MPa (customized for higher pressure)

2. Driving air: 0.6 ~ 0.8mpa, 2500 ~ 3000Ln/min compressed air.

3. Pressurized medium: 0.7 ~ 15MPa gas

4. Environment temperature: 5 ~ 40 ℃

5. Environmental humidity: no less than 95%

6. Air compressor: 220V/2KW

7. Floor area: length width height: 1500mm

Ii. Equipment features

MAXIMATOR company brand is adopted for main parts of the system to ensure equipment quality, safety and reliability. Safe and convenient operation, high pressure test performance. When the system is pressurized for testing, the efficiency is high. Reduced labor intensity of workers and increase the safety of staff.

Iii. Technical part

Connect the power air source port of the gas charging station with the air compressor air source, and connect the pressurized air source at the same time. Open the drive air stop valve in the gas booster station. Then open the high-pressure globe valve, the system starts to pre-inflate and pressurize the workpiece. After pressurizing, close the high-pressure globe valve, the system starts to maintain pressure. After maintaining pressure, open the high-pressure unloading valve for pressure relief, and then close all the globe valves. Drive back to the way of the pressure reducing valve must have special operators 甶 adjustment, setting, it is forbidden to adjust at will. (press down the pressure relief valve handle, and the regulating device is locked)

Iv. System maintenance and maintenance

1. Wipe the inside and outside of the equipment clean after each test, and pay attention to the sealing and dustproof of the air inlet and high-pressure outlet

2. The air source is clean without water and solid granular impurities

3. Regularly remove the moisture in the filter element and replace the filter element according to the usage.

4. Equipment transport should avoid vibration, to prevent damage to the digital display table.

5. The equipment is not used for a long time, need to open the equipment activity a few times regularly, so as to avoid its internal sealing ring aging.