Welcome Customer !

Membership

Tianjin Getes Testing Equipment Technology Development Co., Ltd
Free Member ·1YRS
Other

Main Products: 试验机

Xwboo>Products

Tianjin Getes Testing Equipment Technology Development Co., LtdFree·1YRS

  • E-mail

    techhb@126.com

  • Phone

    400-666-7199

  • Address

    NO. 14 ,Fengze Road, Zhangjiawo industrial park,xiqing District,Tianjin

Contact Now

High Temperature Blasting Testing Bed

Model
Nature of the Manufacturer
Other
Product Category
Auto parts testing equipment
Place of Origin
City, Province
Overview
High Temperature Blasting Testing Bed
Product Details

High Temperature Blasting Testing Bed

Blast (pressure) testing bed, developed by our company, is equipment that can be used in the blasting and pressure-resistance strength test for automotive piping, air conditioning system condenser, evaporator, hydraulic hose assembly, metal pipes, oil pipelines, pressure vessels, valves, etc. Main components are imported, with a stable performance, simple operation and easy maintenance feature.

  1. 1. Performance Parameters

  2. 1)Test pressure: 0~100MPa,display precision:0.01MPa;

  3. 2)Medium: water, water or glycol and emulsified liquid and mineral oil;

  4. 3)Medium temperature: RT+10℃~ 150℃;

4)Pressurization rate of liquid: 5 bar/min~100bar/min;

5)Internal size of test chamber: 1000*800*800mm(L*W*H);

6)The part of liquid pressurization adopts control of two levels of high and low pressure to ensure the pressure control precision of low and high test pressure;

7)Piece number of single test: 1 piece;

8)Volume of fluid storage tank: 50L;

9)Equipment color: RAL 7035 (electric grey).

2. Function and scope of application

1)Burst test, leakage test (judged) and proof pressure test:

a)Stepless regulation for pressure;

b) Safety protection of pressure relief;

c)Maximum test pressure: 100 MPa.

2)The typical test programs include:

a)Pressurization with constant speed-burst

b)Pressurization with constant speed-pressure maintaining-burst;

c)Pressurization with constant speed-pressure maintaining-pressure relief

d)Pressurization with constant speed-pressure maintaining-pressurization with constant speed-pressure maintaining-until burst

3)If shut down occurs with leakage alarm, automatic pressure compensation may be conducted;

4)Test data and curve can be displayed in a real-time manner. The test result can be stored automatically. The test report is printed at will;

5)At the time of emergency shutdown, pressure of the test sample and inside the equipment may be discharged manually;

6)The burst chamber is installed with safety observation window and lighting lamp to observe the test condition conveniently and ensures the safety of testers and equipment;

7)Data acquisition software of U.S. NI Company is used for real-time analysis and storage and the test report may be produced and printed.

Similar Product Recommend