Culvert and Tunnel Emergency Drainage
* Culvert is to point to in the construction of highway engineering, in order to make the roads not impede traffic to flow through the channel, in under the roadbed drainage tunnel under construction on the road (water channels), through this kind of structure can let the water flows below the road. Across a natural valleys depressions flood discharge, or across the road as people, animals and vehicles to the size of the interchange channel, or irrigation as canals. Culvert is mainly composed of hole body and foundation, the client and wing wall, etc. Culvert is according to the principle of communicating vessels, commonly used materials such as brick, stone, concrete and reinforced concrete is built. Generally smaller aperture, a tubular shape, box and arch, etc.
* The role of the culvert is quickly ruled out along the road surface, ensure the safety of sub grade. As one of an important part of highway construction, culvert in make up a larger proportion of highway engineering, highway engineering is an important part of the main performance on the project quantity and project cost. According to the relevant information: culvert engineering quantity about a 60% to 70% of the total number of Bridges, plains, about 1 ~ 3 per kilometer; Mountains and average per kilometer high about 4 ~ 6 seats. Culvert project cost about account for about 40% of the total amount of Bridges.
* Of culvert culverts general across the embankment bottom, most have filled soil, roof adopts single hole or double holes, aperture 0.75 ~ 6 m. In accordance with the 12 meters width of double holes, water depth of 1.5 meters, culvert length 100 meters, the culvert water volume of 1800 cubic meters. With large flow after 2000 m3/h trailer type pump station, can be in one hour will be drainage culverts.
* The concrete culvert standard:
http://baike..com/subview/84974/84974.htm
* Highway tunnel (highway tunnel), built in the ground for the car, and the general do pipeline and pedestrians and other channels.
The main body of highway tunnel structure generally consists of hole body, lining and David, in the mouth of the cave is easy to collapse, also add open cut tunnel. The accessory structures of the tunnel waterproof and drainage, ventilation and lighting, traffic signals, and emergency facilities, etc.
* Highway tunnel, the chance of flooding is relatively small, but also happen from time to tome. Because tunnel is longer than the product surface, should choose a big flow high lift trailer type pump station, ensure that the water sent to the remote.
 |  |  |