High voltage bridge for cable fault location, which can be used to locate all cable insulation and sheath faults except partial short-circuit faults. It integrates burn-down mode and intelligent bridge mode. It is especially suitable for insulation fault location of high-voltage, large-section, long-distance complex cable systems, such asinsulation fault location of complex high-voltage cables with GIS terminals and cross interconnections. Positioning can be accomplished quickly without removing GIS switches and shorting cross interconnects.
The rated voltage of the burning mode is 60kV, and the short-circuit current is 600mA, which can quickly burn high-resistance faults to low-resistance. The rated output voltage of the intelligent bridge is 0-4KV continuously adjustable, and the working current is 600mA, which greatly improves the accuracy of fault location.
High voltage bridge for cable fault locationis a high-voltage constant current source composed of switching power supply, with high voltage and stable current.
(1)The bridge detection module integrates high-potential large LCD display. The operation button on the panel is ground potential, and the bridge is operated through an insulating rod.
(2)Special four-core shielded high-voltage measuring cable, copper mesh braided shielding layer is reliably grounded, and safe to use. The four-terminal resistance measurement method avoids the error of lead resistance.
(3)High voltage constant current source and bridge are integrated in a portable pull rod plastic box. High voltage, light weight and convenient operation.
(4)Compared with the wave reflection method, the bridge method has no blind spots, and is especially suitable fordetermining the breakdown point near short cablesandthe end.
(5)High voltage and large current are especially suitable for fault location of insulation and sheath of complex high voltage cable system with large length and large cross-section.
Technical parameters
Burn-down mode
The output voltage
0~60kV Continuous adjustable
Short circuit current
600mA
A bridge model
The output voltage
0~4kV Continuous adjustable
Short circuit current
600mA
LCD The display screen
3.5 inch TFT Color screen
Positioning accuracy
±(0.2%·L+1)m
Test range
1~50000m
Operating keyboard
One key operation
power supply
220V AC±10%,50Hz
power
2kVA,Generator power supply (greater than 2kW)
weight
29kg
Dimensions (length × width × height)
30cm´46cm´50cm
Operating temperature
-10℃~+55℃
Panel description
Figure 1 Smart Bridge Panel
item
panel buttons
Panel button description
1
Voltmeter
Output voltage in KV
2
Ammeter
Output current in mA
3
Bridge indication
Turntable switch The light is on when in the bridge mode
4
Fuse holder
Built-in 10A (5×20) fuse
5
Power socket
Power frequency 220V±10%
6
Grounding post
The equipment and the test site must be reliably grounded to prevent the shell from being electrified, endangering personal safety and damaging the equipment
7
Output selection dial
Select bridge output or burn-through output. Method: Rotate the turntable clockwise to expose the burn-through output socket and select the burn-through mode; rotate the turntable counterclockwise to expose the bridge output socket and select the bridge mode; only two gears can be rotated
8
Burn-down mode
Turn table switch The light is on when in burn-through mode
9
High voltage enable
Press this button to power off and the high voltage output will be disconnected. Rotate the button clockwise to pop up, and the device can resume normal operation
10
High voltage adjustment
Rotate clockwise to increase pressure, and vice versa to decrease pressure. It is interlocked with the high-voltage switch. Only when the knob returns to zero counterclockwise, the high-voltage can be switched on, and the bridge indicator or burn-through indicator is on before the voltage can be boosted.
High pressure: Press this button, the button's indicator light is on, then high voltage can be output. If the switch cannot be closed, it may be that the high-pressure adjustment knob is not in the zero position or the high-pressure enable button has not popped up
11
High pressure
Press this button, the button's indicator light is on, then high voltage can be output. If the switch cannot be closed, it may be that the high-pressure adjustment knob is not in the zero position or the high-pressure enable button has not popped up
12
Power switch
Turn the switch clockwise, the power indicator light is on, and the instrument is powered on
13
Set/Confirm
Bridge positioning operation button. In the LCD screen operation interface, turn the button clockwise or counterclockwise, the cursor will move accordingly, select the menu or input parameters, press the button to confirm the selection or modify the result
14
LCD screen
Man-machine operation interface display screen
Burn through and DC withstand voltage
Site safety rules
The DC withstand voltage and burn-through output voltage is up to 60kV, and the on-site safety rules must be followed:
1. The area at both ends of the test cable is equipped with safety fences and hazard warning signs, and irrelevant persons are prohibited from approaching. At the far end of the cable, leave one person for supervision.
2. The instrument is reliably grounded. The rust or paint on the surface of the grounding body must be cleaned and grounded.
3. Operators must undergo professional training. If the equipment is abnormal, press the emergency stop button immediately, and the equipment will automatically cut off the high voltage output power supply. After discharging the test product with a discharge rod, turn off the power switch and disconnect the wires
DC withstand voltage test
High voltage bridge for cable fault location can do withstand voltage test. Unlike general withstand voltage equipment, there is no over-current alarm function. The insulation status should be judged based on the reading of the voltage and ammeter.
The wiring and operating steps of the DC withstand voltage test are the same as the wiring and operating steps of the burn-through test.
Burn-through test
Figure 2 Schematic diagram of equipment burn-through wiring
(1)The red clamp of the output cable clamps the core under test, and the black clamp connects to the outer shielding layer.
(2)The protective ground of the instrument chassis should be reliably grounded, and the discharge rod should be carried along with it.
●If the equipment needs to work for a long time, it is necessary to set the high pressure adjustment knob to the zero position at a certain interval, and then continue to use the internal components after cooling down.
Insulation judgment
(1)Connect the ground wire and the discharge rod, and use the discharge rod to discharge the cable under test.
(2)Test the insulation resistance of the cable to be tested with a multimeter and an insulation shaker, and record the test results in detail. Do a DC withstand voltage test in the burn-through mode of the cable to be tested, observe the current and voltage values, and record the test results in detail. If the cable fault phase current is very small or the current is unstable, use the burn-through mode to reduce the fault resistance until the current is stable.
(3)Record the length of the cable to be tested, the material of the cable core and the cross-section parameters.
Fault pre-positioning
*When using the bridge method, cross section method or intelligent voltage method for positioning, if the current is less than 20mA or the current is unstable, the positioning should be terminated. Use the equipment burn-through mode to burn high-resistance faults into low-resistance faults, and the current is stable, and then pre-position.
Principles for selecting bridge method, cross-section method and intelligent voltage method
If the cable length is known, use the bridge method or voltage comparison method; if the cross-sectional area and material are known, use the section method.
The electric bridge method must have the following conditions at the same time:
(1)The cross-sectional area of the faulty cable and the auxiliary cable are the same, and the cable length is the same;
(2)The far end of the cable must be short-circuited with a low-resistance short-circuit wire;
(3)There is no broken core in the faulty cable.
The section method must have the following conditions at the same time:
(1)The faulty cable and the auxiliary cable have the same cross-sectional area and the same material;
(2)The far end of the cable can be short-circuited with a low-resistance short-circuit wire or other low-resistance connecting wires;
(3)There is no broken core in the faulty cable.
The voltage comparison method must meet the following conditions:
(1)Known cable length;
(2)The conductor section of the faulty cable is the same and the material is the same;
(3)Test the voltage values of the two wiring methods, calculate the percentage of fault points, and calculate the distance to the fault point from the known length.
1. Use a multimeter to determine whether there is a broken core in the fault phase. The broken core fault cannot be tested with the electric bridge.
2. Test end: the red clip is connected to the faulty core, and the black clip is connected to the auxiliary core (use a phase with good insulation or a phase with relatively good insulation). The grounding clamp is reliably connected to the cable shielding layer.
3. Cable far end: Use the FJ2 low-resistance short-circuit wire provided with the machine to short-circuit the faulty core and the auxiliary core. When the section method is adopted, other wires can be used for short-circuiting.
4. The ground terminal of the equipment is reliably connected to the grounding body of the positioning site, and the discharge rod is connected to the ground terminal of the equipment.
Legal position of intelligent voltage
The advantage of the intelligent voltage method is that the short connection of the opposite end can be thin wire, auxiliary cable with different cross-sectional area. Applicable to the following two fault types:
(1)Sheath fault: with the help of the fault cable core as an auxiliary cable, find the cable sheath fault distance;
(2)Main insulation fault of single core cable: find the main insulation fault distance with the help of other phase core wires as auxiliary cables.
Precautions
1. The equipment generates a high voltage of up to 60kV. It can be used when at least two people are present. One person makes the connection and the other person checks. The test can be started only after it is accurate.
2. The grounding terminal of the equipment is the safety grounding point of the casing, and the grounding must be reliable. Use a dedicated ground wire, clamped to, for example, the grounding column of the proving ground, the grounding bar of the electrical cabinet, and the feet of the mechanical equipment.
3. During the test process and after the test, before people touch the high-voltage parts, they must first discharge with a discharge rod, and finally hang up the grounding wire.
4. For capacitive test samples, such as cables, do not directly short-circuit the high-voltage end of the cable (that is, the red and black clips of the output cable of the instrument) and discharge the ground when the cable still has residual voltage. At this time, although the power of the instrument has been turned off, the high-voltage output red and black clips are still connected to the cable. The pulse signal energy generated at the moment of short-circuit discharge is large, and it is fed back to the machine through the output cable, which is easy to cause damage to the machine.
5. During the bridge test, make sure that the low-resistance short-circuit wire is connected well. Before the test, you need to use a multimeter to check the connection of the short-circuit wire at the test end of the cable.
6. The instrument panel has burn-through and bridge test output ports. Make sure that only one test wire is connected to the instrument in any test. Do not connect two test wires at the same time.
7. Use the bridge method, cross-section method or intelligent voltage method to locate the process, do not adjust the high-voltage adjustment knob.
Product accessories display
Packing List
On-site case
Remarks
◆This pointing device has passed the international standard certification CE ISO9001
◆The general delivery time of the equipment is 5-8 days. The specific negotiation at the time of ordering shall prevail.
◆The standard packaging is a wooden box for export to protect the safety of equipment transportation.
◆Usually shipped by international express, such as FEDEX, DHL, , ARAMEX, etc.
◆XZH Team is a young team. Our development philosophy is humanized management, intelligent cloud-based products, and internationalized operations. Our development mission is to make electrical equipment free from undetectable failures.
XZH TEST Welcome your inquiry~
FAQ
Q: Would you accept OEM order?
A: Yes, we accept, welcome you contact us for more discussion.
Q: What’s your terms of payment?
A: Payment terms can be negotiated, in general, Payment≤USD2000, 99% paid in advance.
Amount over USD2000, can be negotiated.
Q: Why should you buy the High Voltage Bridge For Cable Fault Location from us?
A: Professional R&D and technical support.
Provide overall laboratory solutions to your project.