Welcome Customer !

Membership

XZH TEST
Free Member ·1YRS
XiAn,ShanXi
Manufacturer

Main Products: Transformer Testing Machine|Other Testing Machines

Xwboo>Products

XZH TESTFree·1YRS

  • E-mail

    happyxzh@xzhjdkj.com

  • Phone

    86-029-86093121

  • Address

    Building B8-01, Phase I, Ronghao Industrial City, No. 2098, Weiyang 9th Road, Gaoling District, Xi'an City, Shaanxi Province, China

Contact Now

DC High Voltage Power Supply

Model
Nature of the Manufacturer
Manufacturer
Product Category
Power Cable Testing Equipment
Place of Origin
City, Province
Overview
Impulse high voltage: 0~35kV optionalShort circuit current:320mAHigh voltage divider: voltage accuracy class 1.5Capacitors can be connected: 4μFImpact time: 1 to 8 secondsImpact power: 400W can be customizedOver temperature protection: 85℃Volume:400L×310W×320H Working power:AC 220V±10% 50Hz±2HzAmbient temperature:-20~+50℃
Product Details

DC high voltage power supply is mainly used as the grade voltage of underground cables of 0-35kv and below. It is a protable and high-voltage power supply for impulse discharge during field testing of underground fault cables. It is used together with high-voltage pulse energy storage capacitor, equivalent to a split type high-voltage pulse generator. It becomes an indispensable testing equipment for prelocator and pinpointing locator of main insulation fault and outer sheath fault of testing cables; It can also be used for DC withstand voltage test of other electrical equipment.

 

The high-frequency DC high-voltage power supply fully meets the general technical conditions for high voltage test equipment (DL / t846-2004) and the guidelines for the implementation of on-site insulation test (DL / t474-2006), and completely replaces the traditional test transformer and operation box with large volume and heavy weight. It adopts the humanized design and operation mode, and is safe and reliable. It is the portable DC impulse high-voltage equipment with the lightest weight, arbitrary combination of capacity and the most humanized operation in China. It is an ideal product for our power cable fault detection.

 

DC high voltage power supply adopts special high-voltage electronic components and high-frequency high-voltage technology with high accuracy and high stability, which makes the whole machine simple in structure and ultra light in weight. The equipment has the automatic protection function of overcurrent, overvoltage and overheating. The impact discharge is uniform and the discharge speed is controllable; The super short circuit protection function can make the high voltage output directly short circuit to the ground.

 

Unique high-voltage side voltage measurement, real-time and accurate; In the stopped state, the voltmeter can indicate the capacitor voltage in real time, and the high-voltage terminal is connected to the micro ammeter in series, which can be used in the case of direct high-voltage generator; With current and voltage double 1.5-level pointer display, it is intuitive and clear, and the impact discharge process is clear at a glance; Unique self discharge design, as long as the high-voltage output is cut off, its own high voltage is zero; With zero start protection, safe and reliable;

 

Panel Description

1、High voltage output: dedicated DC high voltage output terminal;

2、Voltmeter: high voltage output voltage indicating kV meter;

3、Power input: AC 220V 50Hz power input;

4、Power switch: the power switch of the device, when the power switch is turned on, the indicator light is on;

5、Start button: When the start button light is on, it means that the voltage output is in the zero position. The start button is valid when it is on. If the start button light is not on after turning on the power switch, adjust the voltage adjustment knob counterclockwise until the light is on. When the start button light is on , press this key to start the device and generate high voltage output;

6、Stop button: When the stop button light is on, it means that there is high voltage output. When the test is completed or the test is abnormal, press this button to cut off the high voltage output of the power supply;

7、Voltage regulation: adjust the size of the voltage output after startup;

8、Ammeter: indication of the magnitude of the current on the low-voltage side;

9、Grounding post: high voltage grounding, safety grounding. When working, it must be grounded separately and reliably, and the grounding resistance is less than 10Ω.

 

Onsite operation

1、Schematic diagram of cable fault test site

Fig. 1 Inductive sampling wiring diagram

 

Fig. 2 Wired sampling wiring diagram

     2、Connect to AC 220V power supply;

     3、Turn on the power switch, then the power switch indicator light is on;

     4、When the "start button" light is on, press the "start" button to start the high voltage. If the "Start button" light is not on, you should adjust the "Voltage Adjustment" knob counterclockwise to the end to ensure that the "Voltage Adjustment" knob is in the zero state, then the "Start button" light is on;

   5、When the high voltage starts normally, the "stop button" light is on, at this time slowly adjust the "voltage adjustment" knob clockwise, observe the "voltmeter" indication, and adjust to the discharge voltage or the desired DC withstand voltage;

     6、When the discharge interval is too fast: we can adjust the "voltage adjustment" knob counterclockwise to reduce the output high voltage; when the discharge interval is too slow: we can adjust the "voltage adjustment" knob clockwise to increase the output high voltage; "Voltage adjustment" knob to make the discharge interval to our satisfaction;

    7、After the fault test or DC withstand voltage test is completed, adjust the "Voltage Adjustment" knob counterclockwise to the end to ensure that the "Voltage Adjustment" knob is in the zero state, and the "Start Button" light will turn on at this time;

    8、After the "start button" light is on, press "stop" to cut off the high voltage output; use a discharge rod to discharge the high voltage of the capacitor, and connect the ground wire directly to the high voltage end of the capacitor;

    9、Turn off the power switch; store all test leads.

 

Note:

A. When any abnormality occurs during the test, we can press the "stop" button or turn off the power switch to ensure safety.

B. No matter what the test is, when removing the high-voltage line, in order to ensure safety, we must carry out the discharge and grounding lines

 

 

On-site  case

 

Remarks

◆This cable pipe locator has passed the international standard certification CE ISO

◆Lead time is 5-8 days. The specific situation can be negotiated when you place an order.

◆The transport package is a special wooden box with bubble cotton inside. very safe.

◆We usually deliver equipments by FEDEX, DHL, , ARAMEX, etc. It can be negotiated according to different countries.

◆XZH Team is a young team. Our development philosophy is humanized management, intelligent cloud-based products, and internationalized operations. Our development mission is to make electrical equipment free from undetectable failures.

 

 

XZH TEST   Welcome your inquiry~

 

FAQ

Q: Would you accept OEM order?

A: Yes, we accept, welcome you contact us for more discussion.

Q:  What’s your terms of payment?

A:  Payment terms can be negotiated, in general, Payment≤USD2000, 99% paid in advance.

 Amount over USD2000, can be negotiated.

Q:  Why should you buy the product from us?

A:   Professional R&D and technical support.

Provide overall laboratory solutions to your project.

Strict quality control and one year of warranty.

Short lead time and fast delivery.